Yes. At BELI Technologies, a PCB assembly supplier in Shenzhen, prototypes and small batches run on the same SMT lines as volume production, so a product moves from pilot run to volume production with one supplier. A pilot run is ordered as a small batch, and there is no minimum order quantity for prototypes. Small batches are electrically tested by flying probe; production runs move to ICT at ≥95% node coverage, on custom test fixtures built in 2–3 working days. Stencils and test fixtures are kept for repeat orders. The SMT lines place approximately 52 million components per month, and first-pass yield is ≥99.5%.
| Production lines | Prototypes, pilot runs and volume production on the same SMT lines |
|---|---|
| Pilot run | Ordered as a small batch; no MOQ for prototypes |
| Electrical test | Flying probe on prototypes and small batches; ICT on production runs, ≥ 95% node coverage |
| Test fixtures | Built in 2–3 working days; kept for repeat orders; they remain your property |
| Line capacity | Approximately 52 million component placements per month |
| First-pass yield | ≥ 99.5% |
Can one supplier take my product from pilot run to volume production?
Yes. BELI builds assembled boards from the customer’s own Gerber files and BOM, from prototype and pilot run through to volume production. Prototypes and small batches run on the same SMT lines as volume production, so your production order is built on the SMT lines your pilot run used, with AOI and X-ray inspection on every order at both stages, and data gathered at the pilot stage stays relevant. The SMT lines place approximately 52 million components per month, with components down to 01005, BGA pitch down to 0.25 mm and ±0.03 mm placement accuracy; the full list is on the manufacturing capability page.
What is a pilot run, and how large should it be?
A pilot run is a small batch built with the production process before you commit to volume: it shows whether the design assembles and tests repeatably, whereas a prototype shows whether the design works. At BELI a pilot run is ordered as a small batch, and you set the quantity in the RFQ; there is no minimum order quantity for prototypes — a single board is a valid order. Size the pilot run to what your validation plan needs to learn. The walk-through of EVT, DVT and PVT build stages covers what to hand your supplier at each gate.
How does testing change between the pilot run and volume production?
The electrical test method is matched to the quantity. Prototypes and small batches are tested with a flying probe, with no fixture to build. Production runs are tested with ICT, which reaches ≥95% node coverage on custom test fixtures built in 2–3 working days. AOI and X-ray inspection run on every order at every stage, and functional test runs to your test plan. Burn-in up to 72 hours and temperature and humidity screening from −40 to +125 °C at 20–98% RH are available; name the duration and profile in your RFQ. Details are in the guide to functional testing and ICT.
What carries over from the pilot run to the production order?
Stencils and test fixtures are kept for repeat orders, and custom functional-test fixtures are built for your product and remain your property. Every client is assigned a dedicated English-speaking project engineer. Each order ships with a first article inspection (FAI) report and a component lot and date-code list, so pilot and production batches can be compared from their records. If the design changes after the pilot run, send the new revision’s files and test specification with the RFQ for the production order, and state the revision on the purchase order.
How are components sourced as the quantity grows?
Every BOM line is checked for availability, lifecycle and alternates before purchase, and long-lead or end-of-life parts are flagged to you with alternatives before parts are bought, at the pilot stage as well as at volume. Components are bought from authorized distributors and original manufacturers, and the distributor for each BOM line is listed on the quotation. Standard parts typically arrive in 3–7 days. Both turnkey and consignment models are supported, with no fixed ratio between them, so parts you already hold can be consigned. More on the component sourcing service page.
How long does a pilot run take, and how is the production schedule set?
Quick-turn prototype assembly takes 48 hours once boards and components are in hand, and turnkey orders that include component sourcing typically take 2–3 weeks. Within a turnkey order, bare boards run as fast as 24 hours for 1–2 layer boards and typically 3–7 working days for multilayer boards, and standard parts typically arrive in 3–7 days. Custom test fixtures for the production run are built in 2–3 working days. For a production order, state the quantity and the delivery schedule you need in the RFQ, so the lead time is quoted against them.
What are the payment, shipping and warranty terms at volume?
Sample and small-value orders are prepaid in full; larger production orders are paid as a 30% deposit and a 70% balance before shipment, and net payment terms are available for established repeat customers. Every quotation states its payment terms. Most customers order under EXW or FOB Shenzhen, and DAP and DDP are also quoted. Express delivery to North America, Europe and Israel typically takes 3–7 days, with air and sea freight for larger volumes. Assembled boards carry a minimum 12-month workmanship warranty.
Prototype, pilot run and volume production with the same supplier
| What changes | Prototype | Pilot run (small batch) | Volume production |
|---|---|---|---|
| SMT lines | The same SMT lines as volume production | The same SMT lines as volume production | The same SMT lines, with capacity for approximately 52 million component placements per month |
| Order quantity | From a single board; no minimum order quantity | A small batch; you set the quantity | Production quantities, stated in your RFQ |
| Electrical test | Flying-probe test | Flying-probe test | ICT on a custom fixture, at ≥95% node coverage |
| Inspection | AOI and X-ray on every order | AOI and X-ray on every order | AOI and X-ray on every order |
| Tooling | Stencil kept for repeat orders | Stencils and test fixtures kept for repeat orders | ICT fixture built in 2–3 working days; functional-test fixtures remain your property |
| Lead time | 48-hour quick-turn assembly once boards and components are in hand | Turnkey orders typically 2–3 weeks, component sourcing included | Stated on the quotation for the quantity and delivery schedule in your RFQ |
| Payment | Sample and small-value orders prepaid in full | Small-value orders prepaid in full; every quotation states its payment terms | 30% deposit, 70% balance before shipment |
Request a quotation
To quote a pilot run and the volume order that follows, send your Gerber or ODB++ files, the BOM with manufacturer part numbers, the pick-and-place (centroid) file, and both quantities: the pilot-run quantity and the expected production quantity with the delivery schedule you need. Add your test specification with pass/fail limits, so the ICT and functional-test fixtures can be planned. Quotes and inquiry emails are answered within 24 hours, 7 days a week. BELI signs an NDA before you share Gerbers, BOMs or schematics; your own NDA template is accepted.
Send the files to beli@belitechnologies.com or use the contact form. The documents that ship with every order are listed on the quality documents page.
Related pages
FAQ